





45The house is for sale, privately built on a 25-meter street. In front of the house is a garden, and directly behind the garden is the fifth ring road. There are no residential plots in front of the house. Behind the house is a 32-meter commercial street. Total construction area is 710 square meters. Two floors (two separate apartments, each independent) + an independent annex + a land plot of 509 square meters. The land is suitable for future construction according to engineering plans and approved by the municipality for future building; it is also subdivisible. The land is completely separated and structurally independent from the building. Water tank capacity is 210 tons, 7 trailers. The tank has been insulated with high-quality materials and tested accordingly. Tank concrete pour is C35, 400 kg of cement per cubic meter, including Sika additive. All concrete pours in the house are pumped C35, 400 kg of cement per cubic meter. All concrete pours were done at 5 PM during winter, and all pours were sprayed three times daily for seven days under my personal supervision. Steel bars are SAPAK. There was engineering supervision on steel and testing of concrete pours. Vibrators and fans were used in all concrete pours. Soil testing was conducted and no issues were found. Backfilling was carried out in seven stages; each stage involved releasing 3 trailer loads of water, and 25-ton lead weights were used in each stage. Insecticide was applied beneath all foundation slabs. Foundations were isolated using 12 large barrels of liquid bitumen, and the leveling slab beneath the foundations and ground floor was also isolated. All electrical, lighting, and plumbing installations are Gulf AGM standard. Drainage pipes have iron bases underneath. Construction complies with Saudi building code specifications. All blocks are volcanic rock with 7 holes, thermally and acoustically insulated from Al-Wadi Al-Akhdar. Mobile network towers are fully available, with no interference. The first floor is fully finished with double-glazed windows. The second floor is fully finished, with electrical and plumbing fixtures (outlets and lighting) ready; only windows, paint, and doors remain. For the annex, electrical and plumbing supplies are ready; only painting, windows, gypsum, doors, and fixture installations remain. The contractor, Mohammad Mahmoud Al-Zahrani, is well-known and reputable in contracting and large projects. Carpenters and ironworkers are his dedicated employees under his guarantee, and he has a private engineer who continuously supervises them. Price is negotiable; serious buyers will not disagree with me. Direct owner, no broker. (Phone number appears when pressing the contact button) ### License Owner: Deal Real Estate Application Company License Expiry Date: 2026-10-19 View ad details on Deal platform https://dealapp.sa/en/ad-details/7200728042
