Browse
···
Log in / Register
Building contractor for additions and restoration64178835083267110
Building contractor for additions and restoration64178835083267111
Building contractor for additions and restoration64178835083267112
Building contractor for additions and restoration64178835083267113
Building contractor for additions and restoration64178835083267114
12
Free
Favourites
Share

Building contractor for additions and restoration

address6403, Inside Marassi Galleria Mall, Bahrain

Some content was automatically translatedView Original
Description

Notes during the execution of upper additions:* 1. Consult the engineer to ensure that additions are compatible with the house's appearance and building safety. 2. Identify electrical and plumbing extensions before starting work. 3. Level the fill material before installing plumbing in the upper additions. 4. Properly design windows and doors before starting work. 5. Ensure proper air conditioning distribution and consider it during execution. 6. Ensure reinforcement of the balcony during execution and connect it properly to the old structure. 7. Ensure proper integration of new steel reinforcement with the existing steel in the building during execution. 8. Determine drainage slope before execution. 9. Confirm slopes before pouring concrete. 10. Use a vibrator during concrete pouring to ensure work quality. 11. To ensure work quality, correct execution, and avoid errors and waste (breakage), it is necessary to confirm agreement terms before starting work.

Source:  haraj View original post

Location
6403, Inside Marassi Galleria Mall, Bahrain
Show map

haraj

You may also like

Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.