Best standards in proper execution through follow-up. First, supervision of structural works as follows:- 1- Supervision of land leveling and earth removal -2- Supervision of formwork installation, setting of shuttering, achieving required levels, then handing over to the engineer 3- Supervising excavation of foundations or formwork (carpentry) and tanks 4- Supervision of carpentry and reinforcement of the building 5- Supervision during concreting and coordination with the concrete plant 7- The supervisor's role is to assist and follow up with the executing contractor 8- Procuring material requests (steel + concrete + cement blocks + ballast + ceiling electrical conduits + plumbing conduits) 🔻🔻🔻🔻 Turnkey Supervision 🔻🔻🔻 Finishing Supervision 1- Electrical rough-in using best and latest methods at lowest cost 2- Thermal plumbing rough-in and testing before tiling 3- Interior tiling including screeding and room squaring + regular exterior tiling 4- Standard gypsum board installation with emphasis on correct fixing 5- Installation of decorative gypsum molding in various types and applications 6- Installation of decorative gypsum molding in various types and applications 6- Complete exterior stone cladding installation 7- Partial stone installation 8- Tile installation using best methods ensuring no settlement 9- Supervision of painting and internal rough-ins 10- Supervision of exterior painting 11- Supervision of final installations: windows + doors + electrical + plumbing 12- Procuring finishing materials and delivering them to site 13- Executing finishes to highest quality standards with full knowledge of work quality Abu Sultan (Mobile number appears when pressing Contact button)