





18The process of mortar breaking and epoxy tank insulation involves several main steps. First, the tank is emptied of water and thoroughly cleaned from any deposits or impurities. Then, any cracks or damages in the tank, such as fissures or fractures, are treated using suitable materials. After that, an epoxy waterproof layer is applied to the walls and floor of the tank, ensuring complete coverage of all surfaces. Finally, the tank is left to dry completely before refilling it with water.
