Browse
···
Log in / Register
Sandwich Panel and Cement Board Additions64656711555203110
Sandwich Panel and Cement Board Additions64656711555203111
Sandwich Panel and Cement Board Additions64656711555203112
Sandwich Panel and Cement Board Additions64656711555203113
Sandwich Panel and Cement Board Additions64656711555203114
Free
Favourites
Share

Sandwich Panel and Cement Board Additions

addressRAJA4436، 4436 الملك سلمان ابن عبدالعزيز سعود الفرعى، 6766, An Narjis, Riyadh 13333, Saudi Arabia

Some content was automatically translatedView Original
Description

Installation of rooms, additions, meeting areas, corridors, and worker rooms in homes using a professional and cost-effective method. Below are the details and installation instructions: 1. Construct metal frameworks; the division, thickness, and dimensions of these metal frameworks are determined according to the client’s available area. 2. Install sandwich panels according to the thickness requested by the client; available market thicknesses are 5, 7.5, 10, and 15 cm. 3. Install gutters for water drainage; gutter height must be no less than 25 cm, and concealed downspouts are installed between walls to channel water. 4. Install cement board wall partitions according to the client’s specifications, using a professional and orderly installation method. The cement board is raised 10 cm above the sandwich panel to conceal the sandwich panel’s corrugation, making the appearance resemble a concrete slab and standard wall. 5. Apply wall insulation between internal and external cement boards, with a 4 cm thickness using insulation materials specified by the client—either rock wool or gypsum board insulation. 6. Install electrical wiring as required. 8. Install gypsum board decorative elements per the client’s design preferences; the client selects the board type: fire-resistant red, standard white, or moisture-resistant green. 8. Raise the floor level with a concrete slab no less than 10 cm thick, reinforced with welded wire mesh. 9. Paint walls after proper surface preparation—e.g., smoothing profiles—to allow subsequent application of filler compound. 10. Apply wall filler compound in no fewer than three layers, and install mesh tape at joints between cement and gypsum boards. 11. Install windows and doors according to the type specified by the client. Our company provides a warranty on all services offered for no less than 10 years. All work is carried out by our specialized team to ensure high-quality execution. Our prices are highly competitive in the market, as all construction materials are supplied directly from our own manufacturing facilities. (Mobile number appears upon clicking the 'Contact' button)

Source:  haraj View original post

Location
RAJA4436، 4436 الملك سلمان ابن عبدالعزيز سعود الفرعى، 6766, An Narjis, Riyadh 13333, Saudi Arabia
Show map

haraj

You may also like

Cookie
Cookie Settings
Our Apps
Download
Download on the
APP Store
Download
Get it on
Google Play
© 2025 Servanan International Pte. Ltd.