Thermal and waterproof insulation Roof insulation is carried out as follows: Cleaning the roofs Pouring foamed concrete Constructing a 20cm high screed Applying bitumen rolls and torching them with flame, extending up the screed Testing the work for a period of 48 hours Also available: tank and bathroom insulation Foundation, neck, and basement insulation Treatment of any leaks or building moisture Note: The building moisture treatment is carried out using materials specifically designated for insulation Execution by Abu Rida