12Notes during the execution of upper additions:* 1. Consult the engineer to ensure that additions are compatible with the house's appearance and building safety. 2. Identify electrical and plumbing extensions before starting work. 3. Level the fill material before installing plumbing in the upper additions. 4. Properly design windows and doors before starting work. 5. Ensure proper air conditioning distribution and consider it during execution. 6. Ensure reinforcement of the balcony during execution and connect it properly to the old structure. 7. Ensure proper integration of new steel reinforcement with the existing steel in the building during execution. 8. Determine drainage slope before execution. 9. Confirm slopes before pouring concrete. 10. Use a vibrator during concrete pouring to ensure work quality. 11. To ensure work quality, correct execution, and avoid errors and waste (breakage), it is necessary to confirm agreement terms before starting work.